Editorial

Categories

Eliminate Downtime

Explore More

Follow us on

Leveraging Digital Twin

Trackunit
At Predict Summit 2020 we met with industry experts and thought leaders to discuss how AI enables construction to eliminate downtime. Here we capture the highlights of key note speakers at he event. Let's here it from Frederico Valente, Imerso.

Digital Twin is a key technology to increase productivity, reduce downtime and rework. A digital twin is an exact copy of what is happening on the job site – when the onsite reality and the documentation in the building plan match each other at all times. The digital twin allows everyone to collaborate better, mistakes are easily found and rectified, and the plan updated to ensure the building documentation is 100% accurate.

How do we make this happen?

  • Provide customers with an online platform which plugs into the building plan – BIM model – to create the twin.
  • 3-D scanning is simple to use – one button, minimal training – Anyone can do this. Within hours the whole building can be captured.
  • Frequency of images is dependent on project requirements. It supplies the most accurate documentation of the job site – high precision in full 3-D. If the project is on track, then the data from the images will match the original building plan. Documentation and reality diverge costing the industry 5-15% of total budget in rework.
  • Manual inspection methods cannot keep pace with the changing building environment.

It’s important to remember that once problems are overlooked, they snowball and create costly downtime, disputes, rework. At handover the documentation will not match what is actually built.

Digital Twin shows constructions’ true face

Frederico Valente

The Solution: Introduce a Regular Workflow Cycle before the building work starts. Implement a simple 5 Step processes to provide the baseline data and the updates.
If changes are detected then an A or B scenario is implemented: e.g. A. Onsite Rework, B. Update BIM Model. The system ensures the on-site team concentrates on Issue Handling – finding solutions. The system is helping construction companies solve problems. Many mistakes are made, so early discovery reduces downtime. Using a digital twin ensures more issues are detected and resolved, real savings are generated and less wasted or unnecessary trips to site are undertaken.

Watch the full key note here:

Share This Paper

Related

Most popular

100 Ways to Eliminate Downtime

S'abonner pour recevoir des e-mails sur les nouveaux articles sur la télématique

Ne manquez plus aucune information. Nous vous enverrons un e-mail lorsque de nouveaux articles seront publiés sur ce sujet.

Today People are Reading

Par Trackunit<!– wpml:html_fragment –>

Industry Report

Constructing a better future

Did you know? 58% of the construction industry says sustainability will dominate agenda in next five years.